Salut. February
13.02.2025
Front Tower I is being bricked at the level of floors 9-10.
The floor slab of the -1st floor of Front Tower V is being built.
The foundation work of Front Tower III is being carried out.
The installation of cold and hot water supply systems and the installation of the sewage system are being carried out at View Tower.