Arsenal House. July
17.07.2024

In section 1, the execution of the vertical elements of the 10th floor is completed. The floor slab of the 10th floor is being assembled.

In section 2, the vertical elements of the 9th floor are being executed.

In section 3, the brickwork is being performed at the level of the 6th floor. Work is being carried out on the vertical elements of the 8th floor.