30.08.2022

In View Tower, the 27th floor slab is completed, the vertical elements of the 28th floor are being installed. Window structures are being installed on floors 17-21. Brickwork of the 21st floor is completed.

In Front Tower I, the 18th residential floor slab is being installed. The vertical elements of the 18th residential floor are being installed. Brickwork is being performed at the level of the 6th and 7th residential floors.

In Front Tower IV, Front Tower V, work is being carried out to install test bushes.