Oasis. October
29.10.2021
In Building 1, work is underway to install vertical elements on the 21st floor. Brickwork is underway at the level of the 11th and 12th floors. Installation of staircases on the 20th floor, installation of ventilation units.
In Building 2, preparatory work is underway to develop the pile field.