Oasis. September
28.09.2021
In Building 1, work is underway to install vertical elements on the 18th floor. Brickwork is underway at the level of the 10th and 11th floors. Installation of staircases on the 17th floor, installation of ventilation units.
In Building 2, preparatory work is underway to develop the pile field.