28.09.2021

At View Tower, work has been completed on the floor slab of the 21st floor, and the installation of vertical elements of the 22nd floor and brickwork at the level of the 18th floor has begun. Installation of window structures at the level of the 14th floor and installation of structures for panoramic glazing at the level of the 17th floor is in progress. Finishing works are underway in public areas on the 14th floor.

In Front Tower I, works are underway to install vertical elements and a floor slab on the 7th floor.

In Front Tower IV and Front Tower V, work continues on the installation of test bushes. A tower crane has been installed.