Oasis. August
31.08.2021

The vertical elements of the 16th floor are being installed in Building 1. The brickwork of the 7th floor has been completed. Work has begun on the brickwork on the 8th and 9th floors. Installation of staircases from the 13th to the 14th floors, installation of ventilation units.

Preparatory work on the development of the pile field has begun in Building 2.