Salut. August
01.09.2021

At View Tower, work is underway to install a floor slab on the 20th floor and brickwork on the 15th floor. Installation of window structures at the level of the 10th floor is underway.

In Front Tower I, works are underway to install vertical elements and the floor slab of the 6th floor.

In Front Tower IV and Front Tower V, work continues on the installation of test bushes and preparatory work for the installation of a tower crane.